Electrolux EXS24HS2WE Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Nie Electrolux EXS24HS2WE. Electrolux EXS24HS2WE User Manual [en] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 24
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
SPLIT - TYPE
P/No.:
[ADD APPLICABLE BRAND HERE]
Przeglądanie stron 0
1 2 3 4 5 6 ... 23 24

Podsumowanie treści

Strona 1 - [ADD APPLICABLE BRAND HERE]

SPLIT - TYPEP/No.:[ADD APPLICABLE BRAND HERE]

Strona 2 - CONTENTS

95. Piping and wrappingBundle the tubing, connecting cable, anddrain hose with tape securely and evenly as shown in Fig.11. Because the condensed

Strona 3 - SAFETY PRECAUTIONS

REFRIGERANT PIPE CONNECTIONSecuring of outdoor unitAnchor the outdoor unit with a bolt and nut 10 or 8 tightly and horizontally on a concrete or r

Strona 4 - BEFORE INSTALLATION

BarCopper pipeClamp handleRed arrow markConeYokeHandleBar"A"C: Putting flare nut on Remove flare nuts attached to indoor and outdoo

Strona 5

Smooth all round Improper flaringEven lengthall roundTubing retainerRear leftFrontRear rightDrain hosePipingConnecting cableCheck For Rear Right Pipin

Strona 6

Insert the piping, drain hose and the connecting cable into the piping hole.Tubing retainerConnectingcable:::::REFRIGERANT PIPE CONNECTION 13

Strona 7

Tubing retainer 14For Rear Left Piping::::REFRIGERANT PIPE CONNECTION

Strona 8

::::REFRIGERANT PIPE CONNECTION 15

Strona 9 - Connecting pipe

Connection of pipes - outdoorTubing retainerConnectingcable:::::7.58REFRIGERANT PIPE CONNECTION 16.

Strona 10 - INSTALLATION

17ELECTRICAL WORKTerminal block of indoor unit7000Btu/h model12000Btu/h modelall models according to diagramTo outdoor unitCord clampL N S 1

Strona 11 - REFRIGERANT PIPE CONNECTION

LS NWire connector of outdoor unitWire -holding board40mm10mmConnect the cable to the outdoor unit::::ELECTRICAL WORK7 18

Strona 12

1CONTENTS Contact an authorised service technician for repair or maintenance of this unit. Contact an authorised installer for installation of th

Strona 13

Checking the drainageCHECKING THE DRAINAGE AND FORMING THE PIPINGDownwardslopeWaterleakageWaterleakageWaterleakageAirDo not raiseAccumulateddrain wate

Strona 14

Air and moisture in the refrigerant system have undesirable effects as indicated below: Pressure in the system rises. Operating current rises. Cooling

Strona 15

Open the valve stem until it hits against the stopper. Do not try to open it further.Securely tighten the valve stem cap with a spanner or the like.Va

Strona 16

Perform the electric safe check after completing installation:1. Grounding work After finishing grounding work, measure the grounding resistance b

Strona 17

23 TEST RUNNING

Strona 18 - ELECTRICAL WORK

! 2SAFETY PRECAUTIONSOPERATING TEMPERATURE 433024-5543024-7T3

Strona 19

65mm or 95mm)Clip AnchorSeal (See page 10 for details)16.0mm 3Cable Tie (5~10)Insulation materialsBEFORE INSTALLATIONTools needed for instal

Strona 20 - Checking the drainage

Connecting pipe AssemblyInstallation PlateSelf-tapping Screw A Clip AnchorLoop theconnectivecable.CBA60cm above60cm above10cm above100cm above612cm

Strona 21 - AIR PURGING

225INSTALLATIONRead completely then follow step by step.Indoor unitOutdoor unitRooftop installatiomInstallation Fig.1Fig.2

Strona 22

Capacity is based on standard length and maximum allowance length is on the basis of reliability. Oil trap should be installed every 5~7 metres.When t

Strona 23 - TEST RUNNING

72. Drill a hole in the wall 1. Determine hole positions according to the diagram detailed in Fig.5. Drill one (1) hole ( 65mm <998*322 or

Strona 24

81. For the left-hand and right-hand piping, remove the pipe cover from the side panel. 2. For the rear-right-hand and rear-left-hand piping,

Komentarze do niniejszej Instrukcji

Brak uwag